Sign In | Join Free | My adobecards.com |
|
Brand Name : Forpro
Model Number : Slip climbing formwork system
Certification : ISO and CE
Place of Origin : shanghai
MOQ : 100 pcs
Payment Terms : L/C, T/T
Supply Ability : 10000 Pcs / year
Delivery Time : 30-45 work days
Packaging Details : Pallet
Material : Q235 Steel, cylinder, wooden plank
Color : Blue lacquer, brown, light green,yellow
Size : 2m to 3m per day climbing speed
Application : Silo, cooling tower,TV tower,cement plant, raw meal silo, testing tower,chimney
Product name : Slip climbing formwork CSF150 system
Type : Climbing formwork,Wall Formwork, Steel formwork,Silo formwork,Climbing formwork
Slip Climbing Formwork System for Continous Construction of High Silo and Cooling Tower
Product definition
Slip formwork is a climbing formwork specially designed for continous concreting along all height, Formwork and platform is drived upword by hydraulic equipment, It's operation is indenpent of crane and weather. The slip climbing formwork is widely used in silo, cooling tower, chimney and tank projects. Standard climbing height each step is approx.1m, and formwok will be climbed up while concrete strength to 0.2 to 0.4Mpa.As a non-stop concreting climbing formwork , there is no horizontal concrete joint need to be treated on the jobsite and much time is saved. 2 group of workers need to be available for 24 hours's concreting per day. Enclosed handrail protection and platform is equiped and provide high safety enviroment for jobsite workers . 1.50m width of main platform and 0.85m width of suspension platform ensure speedy and safe formwork operation. Multi level platforms provide orient work space for formwork operation, concrete pouring,reinforcement installation and concrete surface repairing. The whole system is anchored in the stucture during the whole working process.
Components
• External and internal operation platform
• External and internal suspension platform
• Slip standard formwork
• Hydraulic cylinder and hydraulic unit and hydraulic line
• Adjustable lifting brackets
Advantage and Installation procedure
• High efficiency and short construction period due to continuous concreting and no treatment of horizontal concrete joint
• Better concrete surface due to no construction joint during whole process
• High safety due to closed platform and handrail housing
• Universal components and could be reused to next projects
• Low costs
Applications Field
![]() |
High Safety Slip Climbing Formwork System For High Silo Continuous Construction Images |